The Technical Presentation shall incorporate following details:- |
For CTE (Fresh/Expansion) applications [For Industries/Institutes] |
The Technical Presentation shall incorporate following details:- |
For CTE (Fresh/Expansion) applications [For Industries/Institutes] |
Location of Project on Google Map. Actual Photograph of the site. |
Latitude Longitude |
Existing Site specification details such as River, Lake, Forest, Human settlement etc,
|
Approved Layout Plan |
Raw materials and products. |
Manufacturing process. |
Source of water Water Consumption in different usage. Water Balance. |
Sources of pollution (Air, Water, Hazardous Solid waste etc.) |
Technical details of
adequecy of treatment disposal facilities of Air, Water, Hazardous
Solid wastes. ( Please ensure the presence of technical person
/consultant for discussion) |
Layout Plan of Effluent Treatment Plant with details |
Pollution control measures proposed as per the recommendations of EMP and conditions given by MoEF in letter of Environmental Clearance.(If any) |
For CCA(Fresh/Expansion) applications [For Industries/Institutes] |
Point wise compliance of conditions of Consent to Establish. |
Actual photographs of the Project |
Photographs of Effluent Treatment Plant, Sewage Treatment Plant, Boiler Stack, Air Pollution Control Equipment (Cyclone, Bag Filter, ESP etc), Water Meter, Plantation etc |
Technical details of treatibility and sutability of treatment disposal facilities of Air, Water, Hazardous Solid wastes. (Please ensure the presence of technical person /consultant for discussion) |
For CTE (Fresh/Expansion) applications [For Mines] |
Location of Project on Google Map. Actual Photograph of the site. |
Latitude Longitude |
Existing Site specification details such as River, Lake, Forest, Human settlement etc, |
Approved conceptual Plan, |
Mining Process. |
Product Production capacity |
Source of water Water Consumption in different usage. Water Balance. |
Sources of pollution (Air, Water, Hazardous Solid waste etc.) |
Technical details of
adequecy of treatment disposal facilities of Air, Water, Hazardous Solid wastes. (Please ensure the presence of technical person /consultant for discussion) |
Pollution control
measures proposed as per the recommendations of EMP and conditions given
by MoEF in letter of Environmental Clearance. |
For CCA(Fresh/Expansion) applications [For Mines] |
Point wise compliance of
conditions of Consent to Establish. |
Actual photographs of the Fugitive emission contro arrangements (Conveyor system/Pucca Road / Water sprinkling system) Over Burden Dump managemet, Gabion Wall /Retaining wall, Garland Drain, Settling Tank, ETP/STP, Plantation etc |
Technical details of treatibility and sutability of treatment disposal facilities of Air, Water, Hazardous Solid wastes. ( Please ensure the presence of technical person /consultant for discussion) |
All the information including, data, pictures and other documents must be clearly visible |